Policies and Procedures

facilities planning process

WestConn’s current planning process is based on the 2007 campus master plan that identified capital projects to enable the university to meet its strategic plan. This planning process allows the university to evaluate options for long-term growth and development. It recommends renovations and/or additions, the construction of new buildings, and the adaptive re-use of existing structures. Collectively, the staff of WestConn’s Facilities Planning & Engineering department, WestConn’s Campus Design Review Committee and members of the CSU System Office are guided by the campus master plan to create a framework for developing projects that reinforce a sense of academic community in an atmosphere conducive to learning.

WestConn encourages participation by all segments of its community to determine the most effective use of the university's facilities. A building committee for each campus building has been established, with each chaired by a dean, department head or presidential appointee. Each building committee is charged with evaluating facility modification requests made by its occupants. Recommendations then are made to the Vice President of Finance and Administration. New building projects are assigned to a building committee, comprised of faculty member(s) and administrators and chaired by the Director of Facilities Planning & Engineering. Ultimately, all major construction issues are brought before the university administration for consideration and approval.

In 2002, the WestConn campus design guidelines document was adopted by the CSU Board of Trustees, and a WCSU review committee was established. All projects pertaining to building exteriors and outdoor public spaces are predicated on the interests, goals and objectives set forth in the design guidelines document.

PROCUREMENT OF CONSTRUCTION SERVICES

Permission to agency-administer projects, with an estimated value of $50,000 and over,  must be obtained by WestConn from the Connecticut Department of Construction Services (formerly Public Works) prior to procuring services for the construction, renovation, repair or alteration of any of its facilities.

Requests for Proposals  (RFP)

In accordance with the policies and procedures as defined by the state Department of Construction Services, and the purchasing guidelines as defined by the Connecticut State University System, WestConn seeks bid proposals as follows:

  • Construction contracts valued up to $500,000 only are offered to contractors certified as a small business or minority business enterprise with the Department of Administrative Services' Supplier Diversity Program.
     
  • All construction contracts estimated to exceed $500,000 are offered to contractors holding a prequalification certificate with the Department of Administrative Services' Construction Contracts Prequalification Program. 

All open Request for Proposal solicitations are posted on the State of Connecticut Department of Administrative Services (DAS) contracting portal, http://www.das.state.ct.us/Director.aspx?page=12.  All bids are processed by WestConn’s purchasing department and must be received before the specified date and time indicated on the bid. All late bids are returned to the vendor unopened.

A bid bond in the amount of ten percent of the bid price must be submitted for projects that exceed $50,000.


THE DEPARTMENT OF LABOR'S PREVAILING WAGE REGULATIONS

Under the Department of Labor regulations, all public works projects involving new construction must meet prevailing wage requirements if the total cost of the project exceeds $400,000. For projects involving renovation, remodeling, alteration or repair of an existing structure, the dollar limit requiring prevailing wage compliance is $100,000.  The prevailing wage schedule is included in the RFP as part of the bid package.

 

(Last revised 02-03-12)

 

 

 

WCSU Weather Information

Current Conditions in Danbury


Overcast
Current Conditions

33° F
Feels like 28°

Wind: 5MPH from the S
Humidity: 43%
Pressure: 30.17 in.
Dew Point: 12° F


Emergency / Weather Alert Information

The Emergency / Weather Alert will be posted on the WCSU home page any time an emergency or bad weather causes a delay, cancellation or early closing of the university.

Weather Alert Example

 Visit the Emergency / Weather Alert page

Greater Danbury 5-Day Forecast

Thursday Friday Saturday Sunday Monday
Cloudy with showers possible early.
Mostly sunny and seasonably cool.
Mostly sunny and seasonable.
Partly sunny and mild.
Partly sunny and pleasant.
28° / 49° 29° / 47° 40° / 54° 41° / 61° 38° / 53°