From Luigi Marcone, Interim Associate Vice President for Facilities
__________________________________________________________________

 

Current Facilities Projects which may impact University operations

 

Campus-wide

All Buildings
Fire alarm, fire extinguisher and fire pump testing and maintenance.

Tuesday, July 2nd through Friday, August 28th
Licensed inspectors will be conducting annual inspections and testing of fire alarms, fire extinguishers and fire pumps in all University buildings. Uniformed inspectors from Fire Equipment Headquarters, Fire Protection Testing and Stuart White will need to enter all spaces on campus on these days.

Fire Protection Testing will be here next Friday, August 21, 2015, to test the fire pumps in Haas, Grasso, Pinney, Centennial, WS Campus Center, and VPA Building. There may be unpleasant odors due to the flushing of fire protection sprinklers in the referenced buildings.

FPT will be here to do the Quarterly Sprinkler Testing Tuesday, August 25, 2015, Wednesday, August 26, 2015, and Thursday, August 27, 2015.

Project Manager: Pano Koukopoulos


Midtown Campus

Thursday, August 6th through Friday, August 21st
Pruning of trees on the Midtown Campus.

Project Manager: Michael Spremulli


Current Facilities Construction Projects
Student Center Main Dining Room
Monday, July 20th through Monday, August 24th
Construction continues on the renovation of the main student dining facility. Demolition, construction and restorative work will take place over the next five weeks. Work may take place over weekends and overnight on an as needed basis.

Project Manager: Sodexo


White Hall 1st Floor (Room 122)
Friday, August 21st through Wednesday, August 26th
The floor is being refinished. A water based product is being used to reduce odors, but it will not completely eliminate them. There may be times during the day where noise and disruptions may take place.

Project Manager: Michael Spremulli


White Hall 1st Floor (Room 127)
Monday, August 24th through Wednesday, August 26th
Carpeting is being installed. There may be times during the day where noise and disruptions may take place.

Project Manager: Michael Spremulli
 

CONTACT INFORMATION

Paul Basso
Maintenance Supervisor II, HVAC
Midtown Central Heat Plant (BH-201)
bassop@wcsu.edu
Phone (203) 837-8330

Pano Koukopoulos, MA, CET, CHMM 
Interim Director, EHS
University Hall 002
koukopoulosp@wcsu.edu 
Phone (203) 837-9352

Michael Spremulli
Interim Director of Facilities Operations
University Hall 001
spremullim@wcsu.edu 
Phone (203) 837-8426

Peter Visentin, AIA
Director, Facilities Planning & Engineering
White Hall 001
visentinp@wcsu.edu 
Phone (203) 837-8680

Luigi Marcone, M.S., CHMM
Interim Associate VP for Facilities
Higgins Annex 105A
marconel@wcsu.edu 
Phone (203) 837-9314
Fax (203) 837-8117

WCSU Weather Information

Current Conditions in Danbury


Fair
Current Conditions

55.1° F
Feels like N/A°

Wind: 7MPH from the S
Humidity: N/A%
Pressure: 30 in.
Dew Point: N/A° F


Emergency / Weather Alert Information

The Emergency / Weather Alert will be posted on the WCSU home page any time an emergency or bad weather causes a delay, cancellation or early closing of the university.

Weather Alert Example

 Visit the Emergency / Weather Alert page

Greater Danbury 5-Day Forecast

Wednesday Thursday Friday Saturday Sunday
Slight chance for a morning shower, partly sunny and pleasant.
Partly sunny and pleasant.
Mostly cloudy, chance for some showers.
Chance for morning rain then some afternoon sunshine.
Mostly sunny and mild.
36° / 59° 34° / 56° 36° / 43° 39° / 54° 33° / 54°