A

dfs_logo

 

From Luigi Marcone, Interim Associate Vice President for Facilities
__________________________________________________________________

Camps on Campus

 

Friday, July 24th through Friday, July 31st   the iD Tech Camp will be using the Student Center.

Thursday, July 23rd through Sunday, July 26th Varsity Spirit Cheerleading will be using the O’Neill Center and the Campus Center.

Wednesday, July 22nd through Saturday, July 25th Christian Mission will be using the Campus Center and the Ancell Building.

Sunday, July 26th through Thursday, July 30th No. 1 Soccer Camp will be using the Westside Fields, Sports StadiumCampus Center, and the Ancell Building.

Friday, July 31st through August 2nd Varsity Spirit Cheerleading will be using the O’Neill Center and the Campus Center.

 

Current Facilities Projects which may impact University operations

 

Campus-wide

All Buildings
Smoke detector, fire alarm and fire extinguisher testing and maintenance.
Tuesday, July 2nd through Friday, July 31st
Licensed inspectors will be conducting annual inspections and testing of smoke detectors, fire alarms and fire extinguishers in all University buildings. Uniformed inspectors from Simplex and Fire Equipment Testing will need to enter all spaces on campus on these days.

Project Manager: Pano Koukopoulos


Current Facilities Construction Projects

Berkshire Hall Corridor 1st Floor
Monday, August 3rd through Friday, August 14th
Installation of new flooring will be followed by floor waxing. Anticipate noise and dust from the installation of the new flooring. While service interruptions are not expected, there may be times during the day where access to adjoining spaces may be restricted.

Project Manager: Peter Visentin

 

Higgins Hall 1st Floor
Wednesday, May 27th through Friday, July 24th
Construction continues on the new Math Lab. Anticipate noise and dust from the installation of new flooring.

Project Manager: Michael Spremulli

 

Irfan Kathwari Honors House
Saturday, June 6th through Friday, August 7th
First floor demolition is complete. Construction continues.  Anticipate noise and dust from the installation of new drywall and framing. Electrical work and light construction may disrupt class activities in the adjoining assembly areas. 

Project Manager: Peter Visentin

 

Newbury Hall

Monday, July 13th through Friday, August 7th
Installation of new lighting will begin in the office area Monday, July 27th. The remainder of the 2nd floor and 3rd floor lighting will be installed August 1st through August 7th. While service interruptions are not expected, there may be times during the day where noise and disruptions may take place. Lighting retrofits will only take place in common areas and corridors. 

Project Manager: Michael Spremulli

 

Student Center Main Dining Room
Monday, July 20th through Monday, August 24th
Construction will start on the renovation of the main student dining facility. Demolition, construction and restorative work will take place over the next five weeks. Work may take place over weekends and overnight on an as needed basis. 

Project Manager: Sodexo

 

Visual & Performing Arts Center

Wednesday, July 22nd through Friday, August 14th
Window repairs will be made by Dimeo Construction and Massey Glass to:

·         Stair #3 (all levels)
·         314, 316, 315, 329, 328, 321 and 320
·         218 and 218B
·         104, 104A, 118, 115, 108, 108 (upper), 113 and 113 (upper)
·         Corridors 300D, 300E, 200B, 100F and 100B (upper)

Project Manager: Michael Spremulli

 

White Hall 2nd Floor
Monday, June 8th through Friday, July 24th
Construction has begun on the new 2nd Floor student knuckle lounges. Anticipate noise and dust from the installation of new drywall and framing. Electrical work and light construction may disrupt class activities on floors above or below.
Project Manager: Michael Spremulli


CONTACT INFORMATION

Paul Basso
Maintenance Supervisor II, HVAC
Midtown Central Heat Plant (BH-201)
bassop@wcsu.edu
Phone (203) 837-8330

Pano Koukopoulos, MA, CET, CHMM 
Interim Director, EHS
University Hall 002
koukopoulosp@wcsu.edu 
Phone (203) 837-9352

Michael Spremulli
Interim Director of Facilities Operations
University Hall 001
spremullim@wcsu.edu 
Phone (203) 837-8426

Peter Visentin, AIA
Director, Facilites Planning & Engineering
White Hall 001
visentinp@wcsu.edu 
Phone (203) 837-8680

Luigi Marcone, M.S., CHMM
Interim Associate VP for Facilities
Higgins Annex 105A
marconel@wcsu.edu 
Phone (203) 837-9314
Fax (203) 837-8117

WCSU Weather Information

Current Conditions in Danbury


Fair
Current Conditions

55.1° F
Feels like N/A°

Wind: 7MPH from the S
Humidity: N/A%
Pressure: 30 in.
Dew Point: N/A° F


Emergency / Weather Alert Information

The Emergency / Weather Alert will be posted on the WCSU home page any time an emergency or bad weather causes a delay, cancellation or early closing of the university.

Weather Alert Example

 Visit the Emergency / Weather Alert page

Greater Danbury 5-Day Forecast

Wednesday Thursday Friday Saturday Sunday
Slight chance for a morning shower, partly sunny and pleasant.
Partly sunny and pleasant.
Mostly cloudy, chance for some showers.
Chance for morning rain then some afternoon sunshine.
Mostly sunny and mild.
36° / 59° 34° / 56° 36° / 43° 39° / 54° 33° / 54°